TG Home Page






Our goal is to maintain excellence for our client in their projects, at today's competitive costs. We do this by examining the client's operating philosophy and people available for operating and maintaining their facilities. We then design the facility by taking advantage of our past project experience utilizing this knowledge, and employing skilled personnel to expedite the work in a cost efficient method. Engineering documents and drawings provide clear and concise information for facility design and construction and serve as excellent trouble shooting and maintenance documents when the facility is up and running. The following is a brief summary of our experience.

Project History
Compression
Gas Processing
Oil & Water Processing
Liquids Handling
Automation Projects
Pipeline &
Related Facilities
Power / Cogeneration
Facilities Projects

   Compression Projects

Client

Location

Description

Devon Canada Energy Komie All regulatory, detailed design, procurement and construction management support for the Komie Shale Gas Methane Development Project. Included installing 3 metering skids, power generation, a central Pad location, incineration, on site water storage, inlet separation, compression, dehydration and associated pipelines (27 km of 219 mm NPS)
Devon Canada Energy Wolf Edson Installation of 3 well sites including installation of sour service separator packages, various line heaters, 400 HP Compression and associated pipelines (7.4 kilometers). Installation includes all regulatory, detailed design, procurement and construction management support.
Paramount Resources  Liard (N.W.T.) K29 Battery modifications including installation of sour service (.5%H2S, 20% CO2) compressor packages (AJAX 550 Bhp), and associated facility work. Installation includes all regulatory (NEB), detailed design, procurement and construction management support.
Paramount Resources Kakwa Kakwa Gas Battery modifications, including installation of two compressor packages (Waukesha L7042 GL/ Ariel JGK/4 -1478 Bhp), Inlet Separator, Dehydrator, air compressor, new high and low pressure flare system and flare stack. Installation included all regulatory detailed design, procurement and construction management support.
Paramount Resources Maxhamish, B.C Maxhamish Gas Battery modifications, including installation of compressor packages (Caterpillar/Gemini 1085 Bhp) and associated facility work. Installation included all regulatory (OGC), detailed design, procurement and construction management support.

Aqua-Pure Ventures inc.

Calgary, AB

Engineering, Procurement, Drafting, Project Management, Startup and Commissioning for a mobile evaporator system(patented) which included a roots blower(835BHP) c/w Waakesha driver

Anderson Exploration (Devon Canada)

Elmworth, AB

Permitting, Engineering, Procurement, Drafting, Project Management and Start-up and commissioning for a Grassroots facility for a 50 MMSCFD (30% H2S) compression and dehydration facility. The facility included 4 (1680 HP) compressors, mole sieve dehydration, inlet slug catcher/separation

Coastal Oil & Gas(British Gas)

Bubbles, B.C.

Engineering, Procurement, Drafting, Start-up and Commissioning for a Plant review and modifications including as-building of the Plant, addition of two 1700 HP reciprocating Compressors and new dehydration for 40 MMSCFD gas facility

Saddle Resources Inc

Rainbow Lake, AB

Permitting, Engineering, Procurement, Drafting, Project Management for a Plant review and modifications including as-building of plant, addition of one 1200 HP reciprocating compressor (Sour Service), inlet separation and a group treater

Cypress Energy

Dawson, AB

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of 6 wellsites, two field compressors rated at 750 HP, one main plant compressor rated at 1200 HP for 15 MMSCFD gas

Blue Range Resource

Clearhills, AB

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of 10 MMSCFD compression/dehydration wellsite facilities and gathering system

BXL Energy

Tweedie, AB

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of 1100 HP compression and dehydration facility, 6 km of 4" gas gathering and sales pipeline system

Cypress Energy

Brandt, AB

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of a 600 HP compressor in replacement of a rental unit. Utilizing a surplus used compressor and responsible for the rebuilding and design changes

Cypress Energy

Kimiwan, AB

Permitting, Engineering, Procurement, Drafting, Project Management for the grassroots installation of inlet separation, compression (1200 HP), and dehydration for 10 MMSCFD gas

Cypress Energy

Kimiwan, AB

Permitting, Engineering, Procurement, Drafting, Project Management for the addition of a 600 HP compressor, dehydration, inlet filtration and inlet separation to an existing plant

Coastal Oil & Gas(British Gas)

Bubbles, B.C.

Engineering, Procurement, Drafting, Project Management for the installation of 50 well tie program including gathering system, wellsites, and central compression

Cypress Energy

Roxana, AB

Permitting, Engineering, Procurement, Drafting, Project Management for the Grassroots installation of inlet separation, compression (1200 HP), and dehydration for 10 MMSCFD gas

Cypress Energy

Roxana, AB

Permitting, Engineering, Procurement, Drafting, Project Management for the Installation of 600 HP reciprocating compression to increase flow to 12 MMSCFD

Cypress Energy

Kimiwan, AB

Permitting, Engineering, Procurement, Drafting, Project Management for the Installation of a 350 HP screw compressor, blowcase and wellsite separation

Newport Petroleum

Gilbey, AB

Permitting, Engineering, Procurement, Drafting, Project Management for the Installation of a 1200 HP reciprocating compressor, including inlet separation

Cypress Energy

Innisfail, AB

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of a 200 HP Screw compressor

Cypress Energy

Mossleigh, AB

Permitting, Engineering, Procurement, Drafting, Project Management for the Relocation and installation of an 800 HP reciprocating compressor, and inlet separation

Blue Range Resource

Hillsdown,AB

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of 1800 HP field compression facilities, and gas gathering wellsite facilities

Cypress Energy

Thorsby, AB

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of a 1500 HP Gas Plant Compressor

Newport Petroleum

Open Creek, AB

Permitting, Engineering, Procurement, Drafting, Project Management for the installation and modification of a 700 HP Sour compressor station and associated gathering system

Northrock Resources

Boggy Lake, AB

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of a 400 HP Sweet gas compressor

Northrock Resources

Pass Creek, AB

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of a a sweet gas compression facility

Northrock Resources

O'Chiese, AB

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of a Sweet gas compressor station

Paragon Petroleum

Mikwan, AB

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of a (1200 HP gas compression) Dehydration; wellsite facilities, gas gathering system.

   Gas Processing Projects

Client

Location

Description

Devon Canada Energy Alberta, Canada Detailed Engineering, Procurement, Regulatory and Construction Management for the Tangent Compressor Facility upgrades. Modifications were made to the main central compressor site including upgrades to the Flare system and piping to register the station as a sour facility.

Tullow Developments Ltd.

Bangladesh

Bangora #1 Early Production Facility Upgrade (120 MMSCFD, Inlet Separation, 7000 BHP compression, refrigeration/turbo-expander option.) Metering and construction of a 10" NPS export pipeline to enable extended testing of the Bangora #1 discovery well. Scope of Work included Detailed Design (Process, Mechanical, Civil and Electrical), Module Layout, Procurement, Construction Management, Commissioning and Start-up. 

Tullow Developments Ltd. Pakistan Chachar Gas Field Development consists of a total of three wells for an aggregate production of 30 MMSCFD. Surface facilities consists of Separation, Sweetening for H2S removal, and Dehydration as well as provision for future compression. Scope of Work includes Detailed Design (Process, Mechanical, Civil and Electrical), Module Layout, Procurement, Construction Management, Commissioning and Start-up.

Tullow Developments Ltd.

Pakistan

Permitting, Engineering, Procurement, Drafting, Project Management for a 150 MMSCFD gas processing facility for gas containing 15% nitrogen and 64% CO2. Utilizes the Selexol process with unique energy recovery solutions to minimize fuel gas requirements.

Vintage Petroleum Yemen Inc Yemen TG Engineering was responsible for design and supply of a dehydration package with a design flow rate of 10 MMSCFD. A self contained skid manufactured in Canada and shipped to Yemen including inlet separation, conventional dehydration, hydrocarbon skimming, electric drive pumps, PLC control panel and programming.
Pakistan Oilfields Limited Pakistan The Pindori Gas Plant Expansion consisted of debottlenecking the existing plant to increase capacity to 50 MMSCFD from 35 MMSCFD by adding refrigeration capacity, and revamping the LPG fractionation train. Scope of Work included conceptual and FEED Study with detailed CAPEX/OPEX estimates. Conceptual study also included an option for deep cut LPG recovery via mechanical refrigeration and also by expansion/recompression.
Devon Canada Energy Eaglesham Engineering and Project Management for the Eaglesham area installing wellsites including installation of sour service separator packages, various line heaters and associated pipelines. Installation includes all regulatory, detailed design, procurement and construction management support.

Devon Canada Energy

Livingstone

Permitting, Engineering, Procurement, Drafting, Project Management for the Livingstone Coal Bed Methane Pilot Project which included installing 5 Metering skids, power generation, a central Pad location located on the side of a mountain, incineration, on site water storage and associated pipelines. Installation includes all regulatory, detailed design, procurement and construction management support. The Plant is located in one of the most environmentally sensitive areas in the province.

Paramount Resources Ltd.   Coordination and review of all of Paramount's facilities ensuring they conform to all requirements of EUB Guide 60. The review encompassed flaring and venting, dispersion modeling, review the flare system and flare-knockouts, ignition systems, make up fuel gas requirements for acid gas flares, etc. Preparation of a database for submission to the EUB, and for future additions to the system.
Duke Energy Midstream   Coordination and review of all of Duke's facilities ensuring they conform to all requirements of EUB Guide 60. The review encompassed flaring and venting, dispersion modeling, review the flare system and flare-knockouts, ignition systems, make up fuel gas requirements for acid gas flares, etc. Preparation of a database for submission to the EUB, and for future additions to the system.

Anderson (Devon)

Elmworth

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of a grassroots facility for a 50 MMSCFD (30% H2S) compression and dehydration facility. The facility included 4 (1680 HP) compressors, mole sieve dehydration (UOP), inlet slug catcher/separation.

Anderson (Devon)

Elmworth

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of 14 Well Gathering Program including laterals and Main Pipeline (100 km) Facilities included line heaters/separators, flare system, ESD stations.

Cyries Energy Alberta, Canada Regulatory Applications, Environmental Impact Assessment (SO2 and NOX dispersion modeling), Process Selection, Detailed Engineering and Design (Process, Mechanical, Civil, Electrical, Instrumentation, Automation), Procurement, Construction Management, Commissioning and Startup of Sour gas (0.5 Mol% H2S) sweetening facility designed for an inlet rate of 5.0 MMSCFD gas, 20 BPD condensate, and 10 BPD water.

Anderson (Devon)

West Culp

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of 14 Well Gathering Program including laterals and Main Pipeline. Facilities included line heaters/separators, flare system, ESD stations.

Anderson (Devon)

RyCroft

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of 14 Well Gathering Program including laterals and Main Pipeline. Facilities included line heaters/separators, flare system, ESD stations.

Conoco

Gilbey

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of Installation of various wellsite facilities including Inlet Separation and Pipelines

Gulf Canada

Richdale

Process design and analysis and recommendation for improvements on three (3) GMS/Liquids plants

Amax Petroleum

Big Bend

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of 6 MMSCFD sweetening, dehydration and processing plant

Blue Range Resource

Leduc

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of 5 MMSCFD sour gas plant, including inlet facilities, compression, sweetening & refrigeration

Blue Range Resource

Wood River

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of 12 MMSCFD sour gas plant, including inlet facilities, compression, sweetening & refrigeration

Blue Range Resource

Joffre

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of 10 MMSCFD gas plant including Process studies and debottlenecking recommendations

Brigdon Resources

Stettler

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of 3 MMSCFD gas plant, including inlet facilities, compression, refrigeration

Brigdon Resources

Red Willows

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of 10 MMSCFD Sweet gas plant, 1000 HP compression

Colin Energy

Bougie Creek

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of a 7 MMSCFD sour gas plant, including inlet facilities, sweetening and refrigeration

Int. Colin Energy

Gordondale

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of a 20 MMSCFD sour gas plant, including inlet sweetening and refrigeration

Morgan Hydrocarbons

Northstar

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of a 6 MMSCFD, compression, CO2 removal, dehydration plant

Newport Petroleum

Hoosier Area

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of a 5 MMSCFD Joule - Thompson plant and water disposal system.

Northrock Resources Ltd.

Sakwatamau

Permitting, Engineering, Procurement, Drafting, Project Management for the modification of an existing gas plant 10 MMSCFD

Northrock Resources Ltd. Ferrier Ferrier Gas Plant: Engineering, Procurement, Construction Management and Commissioning of a gas plant, inlet separation, compression and refrigeration.

Olympia Energy

Antelope

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of a 7 MMSCFD sour gas treating facility, gas gathering, and wellsite facilities

Olympia Energy

Worsley

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of 10 MMSCFD gas plant, including inlet facilities, 600 HP compression, refrigeration, gas gathering facilities

Olympia Energy

Gordondale

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of 10 MMSCFD gas plant (1800 HP compression), sweetening, refrigeration, crude oil battery, gathering system, wellsite facilities

Olympia Energy

Bittern Lake

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of Plant expansion from 4 MMSCFD to 14 MMSCFD, including 800 HP compression

Olympia Energy Cutbank Process optimization studies, electric power contract negotiation, field compression facilities, 600 HP.
Longview Penhold Penhold Gas Plant: Permitting, Engineering, Procurement, Drafting, Project Management for the installation of a sour gas plant, including inlet facilities, compression, sweetening & refrigeration.

   Oil & Water Processing Projects

Client

Location

Description

Total E&P Yemen Yemen Block 10 Supply of Gas to PEC. Conceptual, FEED, and Detailed Design for pipeline, delivery and receipt facilities for 15 MMSCFD associated gas supply to a 50 MW power generation facility. Crude Oil Central Processing Facility, produced water handling, potable water treating system, open drain upgrading.
Vintage Petroleum Yemen Inc. Yemen TG Engineering Inc. was responsible for design and supply of an Inlet Manifold package with a design flow rate of 10 MMSCFD gas and 65,000 Bbls day oil. A self contained skid manufactured in Canada and shipped to Yemen including inlet pressure control, group and test header systems.
Devon Canada Energy Turner Valley Review and modifications of all facilities in the Turner Valley area, to ensure they complied with all safety, EUB and environmental concerns. Modifications were made to 5 Satellites and the main Central Battery including the installation of API 620 pressurized tanks, upgrades to the water and oil treating facilities. The facilities were over 50 years old, and required some fairly major modifications and upgrades.
Devon Canada Energy Normandville Review of the central battery in the Normandville area to ensure it complied with all safety, EUB and environmental concerns. Modifications to the main Central Facility including installation of a blower and compressor, new water tank with skimming systems, vapor recovery and flare upgrades.
Newalta/Petro Canada Ft. Mackay Installation of Centrifuge oil treating Facility (Chloride Reduction Project). Modification to main central facility included installation of new solids pad, new centrifuge building with associated flocculent and process packages, piping, completely new centrifuge piping and building, feed tank, and a pump skid. The centrifuge building was elevated approximately 5 meters in the air and three portable skids were installed in the building. The building was elevated to allow the solids to drop into storage containers.
Newalta/EnCana Foster Creek Responsible for the installation of the Foster Creek centrifuge oil treating facility. Modifications to main central facility included installation of new centrifuge skids with associated flocculent and process packages, piping, completely new centrifuge piping installed in an existing building. The centrifuges were elevated to allow the solids to drop into storage containers. The project utilized modular construction for all the skids and centrifuge modules.
Newalta Gordondale Upgrade of the Gordondale oil treating facility. Modifications to main Central Facility included installation of new solids pad, new centrifuge building with associated flocculent and process packages, new piping, complete new centrifuge piping building.
Newalta Stettler Upgrade of the Stettler Oil Battery treating tank farm. Modifications to main central facility included installation of new secondary containment, new oil tanks, new piping complete with concrete utilidor and new central piping building. The complete tank farm was moved to a new location, with minimal disturbance to production operations.
Newalta Halbrite Upgrading the Halbrite oil treating tank farm. Modifications to main central facility included installation of new secondary containment, new oil tanks, new centrifuge building, new piping complete with concrete utilidor and and new central piping building. the complete tank farm was moved to a new location, with minimal disturbance to production operations.
Newalta Brooks Upgrading the Brooks oil treatment tanks. Modifications to main Central Facility included installation of new secondary containment, new oil tanks, new piping complete with concrete utilidor and new central piping building.

Aqua-Pure Ventures inc.

Dallas, Texas

Permitting, Engineering, Procurement, Drafting, and Project Management for a mobile Evaporator system. The systems main function was to clean-up produced water from fracturing operations, providing distilled water to the end users (2300 Bbls/day). The system included Alfa-laval heat exchangers, Inlet separation (Titanium), gas engine driven compression (813 BHP), several pumps, inlet filtration, power generation, air compression, control logics and complete packaged units. The units were completely packaged on three separate skids and were transported to the Dallas area of Texas for operation.

Devon Canada Energy

Ferrier

Permitting, Engineering, Procurement, and Project Management for the installation of a Leistritz Multi Phase twin screw pump (40 HP). The pump was installed to provide a solution for the Hydrate problems occurring in the area pipelines. Installation includes all regulatory, detailed design, procurement and construction management support.

Paramount Resources Ltd.

Kaybob

Permitting, Engineering, Procurement, and Project Management for the installation and modification of an existing sour plant including addition of inlet header building and group and test separator building.

Paramount Resources Ltd.

Kaybob

Permitting, Engineering, Procurement, Drafting, Project Management for the modification to an existing satellite location including installation of 3-750 BBL tanks for on site treating and truck out.

Paramount Resources Ltd. Kaybob Grassroots oil battery (2500 BBL/day). Equipment consisted of Inlet separation, spiral heat exchanger, treater, VRU, pump skid, and a water injection system. The battery was also designed to accommodate a blending scheme, which included tank storage and metering to blend heavy oil, condensate and conventional oil.

Saddle Resources

Rainbow Lake

Permitting, Engineering, Procurement, Drafting, Project Management for the modifications and upgrade of an existing oil battery (6200 BPD sour) which included construction of a new tank farm, addition of inlet group separator, installation of an oil/water spiral heat exchanger, lact unit, PLC/MMI upgrades and installation.

Prime West Energy

Dawson

Engineering, Procurement, Drafting, Project Management for the installation of Design and installation of a temporary oil and water handling facility (1500 Bbls/day) including inlet separation, tank treating, flare system and compression.

BP Pakistan

Pakistan

Engineering, Procurement, Drafting, Project Management for the and design and construction of a modular skid package for a 20,000 BDP water disposal project including clean-up of oil and solids. The modules contained Deep Bed filtration units (walnut Media), Hydrocyclones, disposal/recycle pumps, PLC control.

Unocal Canada

Rimbey

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of a 600 BPD oil treating facility including Water disposal, gas conservation

Newport Petroleum

Hoosier, Sask

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of a grassroots heavy oil battery (14oAPI), 5000 BPD and 1.2 MMSCFD gas. Equipment included pressurized inlet separation, FWKO, Horizontal electrostatic treater, VRU, 100HP solution gas compression, water disposal pumps.

Amoco Canada Petroleum Company

Sundre

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of a 750 Bbl/hr. automated diluent/crude blending skid c/w 2-50 HP centrifugal pumps c/w VFDs

Anadarko Petroleum

Taber

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of Crude Oil Emulsion Treating and Water Disposal, Pipelines, including 3 LACT units

Canadian Crude

Kuwait

Engineering, Drafting, Detailed Cost Estimates for the installation of Waste oil treating facility to clean up the oil lakes in Kuwait after the Gulf War.

Newport Petroleum

Rigel

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of a 1500 BPD Sour oil battery including solution gas conservation

Newport Petroleum

Worsley

Engineering, Drafting, Project Management for battery modifications, to an existing 1,500 BPD sour oil plant.

Newport Petroleum

Shiningbank

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of a 2000 BPD Sweet oil battery and gathering system including solution gas conservation

Northrock Resources

Caroline

Permitting, Engineering, Procurement, Drafting, Project Management for the modification to a 2000 BPD sweet oil battery

Summit Resources

Mirage

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of a 2000 BPD sour oil battery; including gas conservation, water injection; gathering system


   Liquids Handling Projects

Client

Location

Description

Federated Pipelines

Taylor, B.C.

Engineering, and detailed cost estimates for the installation/Electrification of the 1200 HP Mainline pumping station, including a hydraulics study of the complete Northern system

Federated Pipelines

Fort Saskatchewan

Permitting, Engineering, Procurement, Drafting, Project Management for the installation/modification of an existing metering station to handle additional volumes of C2+ and C3+

B.P./Amoco

S.E. Alberta

Permitting, Engineering, Procurement, Drafting, Project Management for the (AEGS), Alberta Ethylene Gathering System, including pipelines and pumping stations (27,000m3/day)

Amoco Canada

Caroline

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of Sour condensate pumping and metering (25,000 BPD) stations

Amoco Canada

Central Alberta

Permitting, Engineering, Procurement, Drafting, Project Management for the Hi-Sulphur Crude System Expansion. Which included installation of 30 km 8" pipelines and metering facilities

Amoco Canada

Rangeland

Engineering, Drafting, Project Management and Cost estimates for a feasibility Study for upgrading pumping facilities on a white products pipeline (45,000) BPD

Amoco Canada

Chinchaga

Engineering, Procurement, Drafting, Project Management for the Condensate Pump Addition, 600 HP mainline pump addition c/w VFD, 800 HP generation installation, site automation and control modifications

   Automation Projects

Client

Location

Description

Lexon Leduc, AB Responsible for the overall engineering and detailed design of the Baker Hughes Leduc Blending Facility. Scope of Work includes, project management/project engineering, electrical design, site lighting calculations, procurement, instrument index, shutdown key revisions, control system architecture (Profibus fieldbus), I&C, mechanical, civil, drafting and all associated deliverables. 
NOVA Chemicals Inc.   Ethylene Pipeline. Provide PLC programming, engineering, design and start-up and commissioning of the Modicon PLC based SCADA system for the control of block valves and ESD systems with communications between the PLC and a Daniel Flow computer. Total of 25 sites.
BP Canada   COEd Pipeline System. Provide PLC programming, engineering, design and start-up and commissioning of the Allen-Bradley PLC based SCADA system. Remote sites incorporating PLC controls of pumps, valves and custody transfer metering, Modbus communications to motor protection relays, flow computers, DCS and telemetry equipment. Total of 50 sites.
BP Canada Rangeland Rangeland Pipeline System. Provide PLC programming, engineering, design and start-up and commissioning of the Allen-Bradley PLC interface to existing Amocam RTU system. The PLCs on these sites control pump station equipment and pass data to the existing Amocam RTUs for data transmission. In excess of 25 sites.
Exxon-Mobil Sierra Sierra Production Facility. Provide PLC programming, engineering, design and start-up and commissioning of the installation of Allen-Bradley PLC based SCADA system for the transmission of crude oil, gas and re-injection water. The PLCs in this application control well head sites and compressors as well as provide line balance information to the central control room. Total of 5 sites.
BP Pakistan Badin Block Badin Block Wellsite Automation. Conceptual design of a SCADA system to facilitate the data acquisition, control and monitoring of its Oil and Gas Production Facilities in the Badin Block. The block contains the following types of facilities:
   A total of 89 Wellhead Sites
   A total of 13 Remote Test Separator Sites
   A total of 42 Jet Pump Sites with either relay control panels or electronic controllers/MODBUS interface
   A Control Center Master Graphics Interface Station
BP Canada Chinchaga Crude Oil and Condensate Inlet Automation. Review existing process at the processing plant. Review BP Canada's piping and valve specification. Complete site visit to the Chinchaga processing plant to substantiate as built drawings. Review and markup of the as built drawings. Develop Scope of Work to present a workable solution. Expedite quotation request for materials. Compile applicable information in order to provide a Project Cost Estimate for AFE approval. Generate demolition IFA and IFC drawings. Involved and contributed in Design Review, HAZOP and HSE Assurance meetings. Compile the construction package.

Amoco Canada

Kemp River

Engineering, Procurement, Drafting, Project Management for the Storage, pumping, truck loading, product segregation and metering facilities for light crude / condensate/ LPG at Chinchaga, Kemp River and Rainbow Terminals. The installation of PLC based integrated control system included the following:
   VFD control for shipping pumps
   BS&W monitoring
   Automatic batch shipping program
   Densitometer interface detection for batch routing
   PLC based custody transfer metering using Omar LGx Flow
    Measurement System
   Automatic daily and monthly product shipping reports
   LPG truck loading station with automatic ticket printing
   SCADA system using VHF Radio Links with repeaters
   Computer based HMI utilizing WINtelligent software

Amoco Canada

Medicine River

Engineering, Procurement, Drafting, Project Management for the modification of the metering, product quality monitoring and remote block valve control from the central control room at Olds. General upgrading of the existing SCADA system Including:
   Upgrading of control system from Daniel Flow computer to Allen-Bradley PLC-5 with O-Link M-10 Modbus Communication Module
   New Control panel with Allen-Bradley Panelview 550 HMI
   New BS&W monitoring and sampling skid.
   Daniel flow computer program modifications
   Replacement of existing Westronic RTU with new data concentrator
   Wiring upgrade of motor operated valves.

Amoco Canada

Raven River

Engineering, Procurement, Drafting, Project Management for the modification of the pipeline station with flow direction control, booster pump control and product metering. The Raven River junction is controlled from the central control room at Olds via a dedicated telephone line. The general upgrading and expansion of the Raven River Junction included the following:
   Upgrading of Allen-Bradley SLC to Allen-Bradley PLC5/11
   Addition of Allen-Bradley Panelview 550 HMI
   Addition of a Omar LGx metering package for line balance metering
   Addition of H2S detection system
   VFD control for pipeline pressure booster pump
   Addition of Motor Operated Valves

BP Canada

AEGS Upgrade

Engineering, Procurement, Drafting, Project Management for the PLC control of 5 pump stations, including Buffalo, Hanna, Scollard, Didsbury and Brightview. The project upgrades included:
Station control of twin pipeline valve header.
   PLC control of VFD and across the line transfer motor controls.
   Suction pressure PID control, with discharge pressure, station power, and motor amps over-ride controllers, of VFD motor drive.
   SCADA control via leased line 4 wire system to Fort Saskatchewan Control Center.
   Modbus Communications to motor protection relays and power relays, with reporting to local graphical interface and SCADA.
   Line balance metering at Hanna and Brightview.

BP Canada

Sundre Truck Terminal

Engineering, Procurement, Drafting, Project Management for the upgrade of the existing crude truck terminal from punch ticket system to automated card reader system with driver data base control. The project included:
   System includes quota management.
   BS&W monitoring and control.
   Reporting and remote data base management.

PanCanadian Petroleum Limited

Empress Ethane Extraction Plant

Engineering, Procurement, Drafting, Project Management for the installation of Octal Systems PLC based OMAR measurement flow computer which included:    Interface PLC to DCS.
   Interface Gas Chromatograph to custody transfer GPA standard mass measurement calculations on ethane system and custody transfer, API net volume calculations on NGL system.
   SCADA communications to control center with plant and line balance information.
   Automated meter proving and densitometer proving abilities.

BP Canada Energy Company's Pump Station

Red Deer

Engineering, Procurement, Drafting, Project Management for the addition of five turbine meters complete with temperature, pressure and density transmitters, Station header valve controls and Graphical user interface.

BP Canada Energy Company's block valve upgrade.

 

Engineering, Procurement, Drafting, Project Management for the addition of motor operated valves and SCADA controls to existing safety block valves on ethane pipeline which included.
   PLC control and communications of local and remote operation via sub-master Cochrane meter station.
   RSView graphical interface for remote and sub-remote operation.
   On site monitoring of station entry, station control and pipeline pressure conditions, as well as VFD single phase to three phase valve operator control.

Saddle Resources 9-25 Battery upgrade

 

Engineering, Procurement, Drafting, Programming and Project Management for the addition of Inlet Separation, Compression and Group Treater. Each skid entailed the addition of LEL, H2S and fire detection. All additions were integrated into the existing Allan Bradley PLC 5 and Panelview HMI, with addition of a modem for remote programming and control.

Saddle Resources 13-36 Battery upgrade

 

Engineering, Procurement, Drafting, Programming and Project Management for the addition of Inlet Separation, Heat Exchanger , new Tank Farm and water injection skid. Each skid entailed the addition of LEL, H2S and fire detection. All additions were integrated into a refurbished Allan Bradley SLC 500 and Panelview 1000 HMI.

BP Pakistan Deep Bed Filtration Project

 

Engineering, Design, Procurement, Drafting, Construction, and Project Management of a Deep bed filtration system to remove oils and suspended solids from produced water in Tangri Pakistan. Produced water is filtered through a deep bed filter utilizing crushed walnut shell media to reduce oil saturation. Produced solids are further reduced via Hydrocyclone separation to over 99% solids concentration.
   Class 1 Division 1 control panel fabrication
   CSA certified
   Allen Bradley PLC with Panelview 1000 HMI interface
   PID flow control
   Electric over pneumatic valve control
   Existing DCS interface
   Multi user security HMI interface
   HMI based component maintenance interface
   Complete system installation, connection, and commissioning
   Publication of all system operational and maintenance manuals


   Pipeline & Related Facilities Projects

Client

Location

Description

Devon Canada Energy Ft. Nelson (Komie Phase I) Provided detailed engineering and procurement services for the Komie Phase I Gas Development Project. Included a two stage compressor, 48" inlet separator, 20" dehydrator, produced liquids tank, a high and low pressure flare system, incineration. All equipment rated for sour service with an H2S content of 0.03% and CO2 content of 20%. The engineering design included the gathering system and sales pipeline (26 km) including hydraulics review and design.
Devon Canada Energy Ft. Nelson (Komie Phase II) Provided preliminary engineering and detailed engineering services for a central gas gathering system sales pipelines and facilities. Facility includes compression, inlet separator, dehydration, water injection, produced liquids tank and a high and low pressure flare system.
Devon Canada Energy Wolf Edson Engineering, Procurement, Regulatory (EUB) and Construction Management support for the Wolf Edson area, installing 3 wellsites including installation of sour service separator packages, various line heaters, 400 HP Compression and associated pipelines (7.4 kilometers).
Devon Canada Energy Cabin Creek Permitting, Engineering, Procurement, Drafting and Project Management for the installation of 4 Well Gathering Program including laterals and main pipeline. Facilities included lien heaters/separators, flare system, ESD stations.
Qatar Petroleum Qatar Dukhan Feasibility Study: Conceptual engineering studies for two distinct activities in the Dukhan fields. Scope of Work includes installation of 120 MMSCFD Dehydrator and 25 km of 20" feed gas pipeline, design, construction and installation of new NGL Raw Booster Pump at FSP (P-1102C), electrical and instrumentation for pump operation, configuration of pump and parameters in DCS.
BP/Amoco Canada Peyto Pipeline Permitting, Engineering, Procurement, Drafting, Project Management for the Peyto System Expansion, which included installation of 100 km 4" pipeline, pump stations and metering facilities.
Nexen Energy Esteven, Saskatchewan Permitting, Engineering, Procurement, Drafting and Project Management for a sour solution gas gathering system. Review of the existing field, detailed review of installation of a gathering system to capture solution gas from several different sites and route to 2 different locations for installation of central dehydration and treatment.
Paragon Petroleum Tomohawk, Alberta Permitting, Engineering, Procurement, Drafting and Project Management for the installation of a 1200 HP gas compression dehydration, wellsite facilities, gas gathering system.
BP Canada Alberta AEGS East/West Leg Pipeline System Looping Project. 300km of 10" pipeline, 4 x 3,000 BHP pipeline pumps. Scope of Work included Conceptual, FEED, Regulatory, Detailed Engineering.
Paramount Resources N.E. BC
(Clark Lake, Tatoo, Maxhamish)
Installation of well sites, including installation for sour service separator packages, various line heaters and associated pipelines. Installation included all regulatory (OGC), detailed design, procurement and construction management support.
Paramount Resources Cameron Hills (N.W.T.) Installation of well sites, including installation of sour service separator packages and associated pipelines. Installation included all regulatory (NEB), detailed design, procurement and construction management support.

Anderson (Devon)

Elmworth

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of 14 Well Gathering Program including laterals and Main Pipeline (100 km) Facilities included line heaters/separators, flare system, ESD stations.

Cairn Energy Bangladesh Detailed engineering design (process, piping, corrosion protection, stress analysis, civil), welding specifications, inspection & test procedures for a 20" gas pipeline in Bangladesh.
Paramount Resources Bitscho All regulatory, detailed design, procurement and construction management support for the installation of wellsites, including installation of sour service separator packages, various line heaters and associated pipelines.

Anderson (Devon)

West Culp

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of 14 Well Gathering Program including laterals and Main Pipeline. Facilities included line heaters/separators, flare system, ESD stations.

Anderson (Devon)

RyCroft

Permitting, Engineering, Procurement, Drafting, Project Management for the installation of 14 Well Gathering Program including laterals and Main Pipeline. Facilities included line heaters/separators, flare system, ESD stations.

Cypress Energy

Dawson

Permitting, Engineering, Procurement, Drafting, Project Management for 12 kilometers of 6" NPS Sour Gas Pipeline and 5 kilometers of 4" NPS gathering system

Viracocha Energy

Puskswaskwa

Permitting, Engineering, Procurement, Drafting, Project Management for 8 kilometers of 4 NPS Sweet Gas Pipeline and installation of Lineheater separator wellsite packages on a dually completed well.

Coastal Oil & Gas

Bubbles, B.C.

Permitting, Engineering, Procurement, Drafting, Project Management for 12 kilometers of 8" NPS Sour Gas (5%H2S) and gathering system

Amoco Canada

AEGS West Leg

Permitting, Engineering, Procurement, Drafting, Project Management for 107 km of 8" HVP pipeline, and a 1500 HP centrifugal booster pump replacement

ANG

Cochrane

Permitting, Engineering, Procurement, Drafting, Project Management for Gas gathering system (NEB regulated pipeline) including the installation of a 1200 HP electric drive compressor

Amoco Canada

Rangeland

Permitting, Engineering, Procurement, Drafting, Project Management for Pipeline, Pump Station and Truck Terminal Expansions

Amoco Canada

Bright view

Permitting, Engineering, Procurement, Drafting, Project Management for 10" Ethane header modifications to allow bi-directional flow on the AEGS pipeline system

Amoco Canada

Raven River

Permitting, Engineering, Procurement, Drafting, Project Management for the South Rangeland system including 30 km of 8" Crude Pipeline, C&R, line balance metering facility and automation.

Amoco Canada

Buck Lake

Permitting, Engineering, Procurement, Drafting, Project Management for 20 km of 4" HVP pipeline, 2000 Bbl storage addition, 500 HP centrifugal mainline pump c/w VFD

Northrock Resources

Caroline

Permitting, Engineering, Procurement, Drafting, Project Management for Pipeline transportation of water for two converted water injection wells

Northrock Resources

Pembina

Permitting, Engineering, Procurement, Drafting, Project Management for Sweet gas pipelines

Northrock Resources

Knopcik

Permitting, Engineering, Procurement, Drafting, Project Management for Sour gas pipelines

Vermilion Resources

France

Permitting, Engineering, Procurement, Drafting, Project Management for Environmental review of pipelines


   FEED & Feasibility Studies

Client

Location

Description

Total E&P

Yemen

Conceptual, FEED, and Detailed Design for pipeline, delivery and receipt facilities for 15 MMSCFD associated gas supply to a 50 MW power generation facility. Crude Oil Central.

Total E&P

Yemen

Facility upgrades to Potable Water, Open Drain, and Installation of CPI Separator. Conceptual, FEED, and Detailed Engineering.

BP Pakistan

Sindh, Pakistan

Tangri Produced Water Filtration System: BP Pakistan required removal of suspended solids and entrained oil to very low levels. After assessing various options, TG recommended a modular system consisting of FEED Pumps, Media Filter, Hydrocyclone, Backwash Strainer and Backwash Pumps, all installed on two skids. Scope of Work included Process Selection, FEED Study, and Detailed Engineering Design. Following a competitive bidding process, TG was also awarded the contract to fabricate the modules, commission the unit and train BPP's operators.

Tullow Bangladesh

Comilla, Bangladesh

Bangora #1 Early Production Facility: Bangora EPF Upgrade (120 MMSCFD), Inlet Separation, 7,000 bhp Compression, refrigeration/turbo-expander option. Scope of Work included Conceptual, FEED and Detailed Engineering.

Tullow Pakistan

Sindh, Pakistan

Chachar Gas Field Development. 30 MMSCFD Sour Gas Plant (MDEA Sweetening), provision for future compression and HC Dewpoint Control. Scope of Work included Conceptual, FEED, PMC services and procurement support.

Tullow Bangladesh

Comilla, Bangladesh

FEED Study for CPF Expansion (Process review, equipment/piping design review, control system review), to upgrade existing Early Production Facility to a permanent one, and expand its capacity to 120 MMSCFD from 60 MMSCFD. Includes provision for HC Dewpoint Control as well as Inlet Compression.

Devon Canada

Elmworth

Elmworth Field Development - Gas Gathering Systems: System & Wellsite Facilities (100KM of pipelines 6-10"), line heaters, SCADA. Scope of Work included Conceptual, FEED, Regulatory and Detailed Engineering.

Qatar Petroleum Qatar Dukhan Feasibility Study: Conceptual engineering studies for two distinct activities in the Dukhan fields. Scope of Work includes installation of 120 MMSCFD Dehydrator and 25 km of 20" feed gas pipeline, design, construction and installation of new NGL Raw Booster Pump at FSP (P-1102C), electrical and instrumentation for pump operation, configuration of pump and parameters in DCS.
GASCO Abu Dhabi Feasibility Study for Replacement of Various Fired Process Heaters: TG Engineering was responsible for preparing high level feasibility studies (equipment sizing/selection, PFD's, Equipment Spacing, CAPEX/OPEX estimates, schedule) for replacement of large (425 MMBTU/HR total) direct fired process heaters with either steam or Hot Oil Systems.

   Power / Cogeneration Facilities Projects

Client

Location

Description

AEC International

Ecuador

Process Engineering, Cost estimates and conceptual studies for a 10 MW Organic Rankine Cycle Plant to recover waste heat from Turbine Exhaust.

Altek Power

Claresholm

Process Engineering, Cost estimates and conceptual studies for a 90 MW Combined Cycle gas turbine/steaming power Plant in Southern Alberta utilized as a peaking plant.

2010 TG Engineering Inc.